Sidney Substation 230kV (GEN-2016-079)

Sidney Substation 230kV is a 160.0 MW solar interconnection project in Cheyenne, Nebraska with a current status of withdrawn. It is proposed to connect at Sidney Substation 230kV.

160.0 MWCapacity
WithdrawnStatus
NEMarket
SolarTechnology

Project facts

Canonical nameSidney Substation 230kV
Queue IDGEN-2016-079
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologySolar
Capacity160.0 MW
StateNebraska
CountyCheyenne
Point of interconnectionSidney Substation 230kV
Requested (queue) date2016-06-30
Proposed in-service date
Operational date
Withdrawn date2017-03-28
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata