Silverline Energy Center (C24-179)

Silverline Energy Center is a 150.0 MW solar+battery interconnection project in Tompkins, New York with a current status of withdrawn. It is proposed to connect at Miliken to Etna Line #974 115 kV line.

150.0 MWCapacity
WithdrawnStatus
NYISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameSilverline Energy Center
Queue IDC24-179
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar+Battery
Capacity150.0 MW
StateNew York
CountyTompkins
Point of interconnectionMiliken to Etna Line #974 115 kV line
Requested (queue) date2024-09-17
Proposed in-service date
Operational date
Withdrawn date
DeveloperSilverline Energy Center, LLC
Utility / transmission ownerNYSEG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata