Soda Lake Solar 1 (18INR0040)

Soda Lake Solar 1 is a 202.6 MW solar interconnection project in Crane, Texas with a current status of withdrawn. It is proposed to connect at Tap 138kV 6601 Rio Pecos - 60014 Spudder.

202.6 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameSoda Lake Solar 1
Queue ID18INR0040
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity202.6 MW
StateTexas
CountyCrane
Point of interconnectionTap 138kV 6601 Rio Pecos - 60014 Spudder
Requested (queue) date2016-10-06
Proposed in-service date2023-05-01
Operational date
Withdrawn date2020-08-19
DeveloperArrington Solar
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.