SOL CATCHER BESS (1302)

SOL CATCHER BESS is a 213.5 MW solar+battery interconnection project in Riverside, California with a current status of operational. It is proposed to connect at Red Bluff 220 kV.

213.5 MWCapacity
OperationalStatus
EasternMarket
Solar+BatteryTechnology

Project facts

Canonical nameSOL CATCHER BESS
Queue ID1302
Statusoperational
Source statusCOMPLETED
MarketEastern
TechnologySolar+Battery
Capacity213.5 MW
StateCalifornia
CountyRiverside
Point of interconnectionRed Bluff 220 kV
Requested (queue) date2016-05-02
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata