Solar Carver 3 Hybrid is a 1.0 MW battery interconnection project in Plymouth, Massachusetts with a current status of active.

1.0 MWCapacity
ActiveStatus
ISNEMarket
BatteryTechnology

Project facts

Canonical nameSolar Carver 3 Hybrid
Queue ID63506_BCRV3
Statusactive
Source status(V) Under construction, more than 50 percent complete
MarketISNE
TechnologyBattery
Capacity1.0 MW
StateMassachusetts
CountyPlymouth
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-10-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSolar Carver 1, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02proposed_online_date2026-09-012026-10-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata