South Valparaiso 138 kV Substation (J3140)
South Valparaiso 138 kV Substation is a 50.0 MW battery interconnection project in Porter, Indiana with a current status of operational. It is proposed to connect at South Valparaiso 138 kV Substation.
50.0 MWCapacity
OperationalStatus
—Market
BatteryTechnology
Project facts
| Canonical name | South Valparaiso 138 kV Substation |
|---|---|
| Queue ID | J3140 |
| Status | operational |
| Source status | Active |
| Market | — |
| Technology | Battery |
| Capacity | 50.0 MW |
| State | Indiana |
| County | Porter |
| Point of interconnection | South Valparaiso 138 kV Substation |
| Requested (queue) date | 2022-09-14 |
| Proposed in-service date | 2026-08-31 |
| Operational date | 2026-08-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NORTHERN INDIANA PUBLIC SERVICE COMPANY |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata