St. Regis River LLC (C24-305)

St. Regis River LLC is a 58.5 MW solar+battery interconnection project in St. Lawrence, New York with a current status of withdrawn. It is proposed to connect at Lawrence - A [136781] to Sugar Island [136806] 115kV line..

58.5 MWCapacity
WithdrawnStatus
NYISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameSt. Regis River LLC
Queue IDC24-305
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar+Battery
Capacity58.5 MW
StateNew York
CountySt. Lawrence
Point of interconnectionLawrence - A [136781] to Sugar Island [136806] 115kV line.
Requested (queue) date2024-10-01
Proposed in-service date
Operational date
Withdrawn date
DeveloperBW Solar Holding Inc.
Utility / transmission ownerNYISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata