Stella 2 Wind (16INR0012)

Stella 2 Wind is a 201.0 MW wind interconnection project in Kenedy, Texas with a current status of suspended. It is proposed to connect at tap 345kV 80076 Ajo - 80071 Zorillo.

201.0 MWCapacity
SuspendedStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameStella 2 Wind
Queue ID16INR0012
Statussuspended
Source statussuspended
MarketERCOT
TechnologyWind
Capacity201.0 MW
StateTexas
CountyKenedy
Point of interconnectiontap 345kV 80076 Ajo - 80071 Zorillo
Requested (queue) date2013-06-12
Proposed in-service date2022-12-15
Operational date
Withdrawn date
DeveloperEon
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata