Tap on Crossroad to Hobbs 345kV (CPP-2028-001)

Tap on Crossroad to Hobbs 345kV is a 400.0 MW solar interconnection project in Houston, Texas with a current status of operational. It is proposed to connect at Tap on Crossroad to Hobbs 345kV.

400.0 MWCapacity
OperationalStatus
TXMarket
SolarTechnology

Project facts

Canonical nameTap on Crossroad to Hobbs 345kV
Queue IDCPP-2028-001
Statusoperational
Source statusICS
MarketTX
TechnologySolar
Capacity400.0 MW
StateTexas
CountyHouston
Point of interconnectionTap on Crossroad to Hobbs 345kV
Requested (queue) date2026-04-01
Proposed in-service date
Operational date2030-01-31
Withdrawn date
Developer
Utility / transmission ownerNEET

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata