TE Smith Storage (22INR0555)

TE Smith Storage is a 125.4 MW battery interconnection project in Rockwall, Texas with a current status of active. It is proposed to connect at 2483 Royse Switch 345kV.

125.4 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameTE Smith Storage
Queue ID22INR0555
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity125.4 MW
StateTexas
CountyRockwall
Point of interconnection2483 Royse Switch 345kV
Requested (queue) date2021-09-02
Proposed in-service date2026-01-15
Operational date
Withdrawn date
DeveloperBT Smith Storage, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata