Tierra Seca BESS is a 102.7 MW battery interconnection project in Val Verde, Texas with a current status of active. It is proposed to connect at 138kV 8255 HAMILTON4A (Hamilton Road Substation).
102.7 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | Tierra Seca BESS |
|---|---|
| Queue ID | 23INR0364 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 102.7 MW |
| State | Texas |
| County | Val Verde |
| Point of interconnection | 138kV 8255 HAMILTON4A (Hamilton Road Substation) |
| Requested (queue) date | 2021-08-24 |
| Proposed in-service date | 2026-01-29 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Tierra Seca BESS, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata