Wabaco to Alma 161 kV Tap (J2600)

Wabaco to Alma 161 kV Tap is a 245.0 MW solar interconnection project in Wabasha, Minnesota with a current status of withdrawn. It is proposed to connect at Wabaco to Alma 161 kV Tap.

245.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameWabaco to Alma 161 kV Tap
Queue IDJ2600
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity245.0 MW
StateMinnesota
CountyWabasha
Point of interconnectionWabaco to Alma 161 kV Tap
Requested (queue) date2022-09-14
Proposed in-service date2026-06-30
Operational date2026-06-30
Withdrawn date2025-10-27
Developer
Utility / transmission ownerDAIRYLAND POWER COOPERATIVE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.