Wagon Wheel Solar (21INR0377)

Wagon Wheel Solar is a 144.8 MW solar interconnection project in Runnels, Texas with a current status of withdrawn. It is proposed to connect at tap 138kV 60399 WEISS – 6340 Ballinger.

144.8 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameWagon Wheel Solar
Queue ID21INR0377
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity144.8 MW
StateTexas
CountyRunnels
Point of interconnectiontap 138kV 60399 WEISS – 6340 Ballinger
Requested (queue) date2019-07-16
Proposed in-service date2023-12-31
Operational date
Withdrawn date2022-04-06
DeveloperOrion Power Generation, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata