Weirwood-Eastville 69kV (X3-040)

Weirwood-Eastville 69kV is a 18.0 MW wind interconnection project in Northampton, Virginia with a current status of withdrawn.

18.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameWeirwood-Eastville 69kV
Queue IDX3-040
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity18.0 MW
StateVirginia
CountyNorthampton
Point of interconnection
Requested (queue) date2011-08-31
Proposed in-service date2016-06-30
Operational date
Withdrawn date2014-08-13
Developer
Utility / transmission ownerODEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata