Northampton County, Virginia — Interconnection Projects
The interXdata warehouse tracks 17 interconnection projects in Northampton, Virginia, representing 208 MW of requested capacity.
17Total projects
0Active
9Operational
8Withdrawn
208 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 125 MW |
| Battery | 2 | 40 MW |
| Wind | 3 | 31 MW |
| Other | 6 | 12 MW |
| Gas | 1 | 0 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Plaintation Creek 69 kV | AF2-055 | Solar | 45.0 MW | withdrawn | Northampton, Virginia |
| Hecate Energy Cherrydale LLC | 61375_PV1 | Solar | 20.0 MW | operational | Northampton, Virginia |
| Bayview 69kV | AH2-048 | Battery | 20.0 MW | withdrawn | Northampton, Virginia |
| Kellam - Bayview 69kV | X4-014 | Battery | 20.0 MW | withdrawn | Northampton, Virginia |
| Weirwood-Eastville 69kV | Z2-012 | Solar | 20.0 MW | operational | Northampton, Virginia |
| Bayview | V2-045 | Solar | 20.0 MW | withdrawn | Northampton, Virginia |
| Bayview | V3-061 | Solar | 20.0 MW | withdrawn | Northampton, Virginia |
| Weirwood-Eastville 69kV | X3-040 | Wind | 18.0 MW | withdrawn | Northampton, Virginia |
| Bayview 26kV (Wind) | G16 | Wind | 8.0 MW | withdrawn | Northampton, Virginia |
| Bayview 25kV | X3-047 | Wind | 5.0 MW | withdrawn | Northampton, Virginia |
| Bayview | 3782_BAYV | Other | 2.0 MW | operational | Northampton, Virginia |
| Bayview | 3782_BYV3 | Other | 2.0 MW | operational | Northampton, Virginia |
| Bayview | 3782_BYV4 | Other | 2.0 MW | operational | Northampton, Virginia |
| Bayview | 3782_BYV6 | Other | 2.0 MW | operational | Northampton, Virginia |
| Bayview | 3782_BYV5 | Other | 2.0 MW | operational | Northampton, Virginia |
| Bayview | 3782_BYV2 | Other | 2.0 MW | operational | Northampton, Virginia |
| Bayview 25kV | Y2-109 | Gas | 0.5 MW | operational | Northampton, Virginia |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Northampton County.
Start tracking with interXdata