Weirwood-Eastville 69kV (Z2-012)

Weirwood-Eastville 69kV is a 20.0 MW solar interconnection project in Northampton, Virginia with a current status of operational.

20.0 MWCapacity
OperationalStatus
—Market
SolarTechnology

Project facts

Canonical nameWeirwood-Eastville 69kV
Queue IDZ2-012
Statusoperational
Source statusIn Service
Market—
TechnologySolar
Capacity20.0 MW
StateVirginia
CountyNorthampton
Point of interconnection—
Requested (queue) date2013-12-31
Proposed in-service date—
Operational date2017-04-01
Withdrawn date—
Developer—
Utility / transmission ownerODEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.