West Queue Project GI-0611 — Wind in Hand, South Dakota is a 1,500.0 MW wind interconnection project in Hand, South Dakota with a current status of withdrawn. It is proposed to connect at Ft Thompson 345kV.

1,500.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project GI-0611 — Wind in Hand, South Dakota
Queue IDGI-0611
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity1,500.0 MW
StateSouth Dakota
CountyHand
Point of interconnectionFt Thompson 345kV
Requested (queue) date2006-08-10
Proposed in-service date2009-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.