Wildhorse POD Solar (23INR0537)
Wildhorse POD Solar is a 10.0 MW solar interconnection project in Howard, Texas with a current status of suspended. It is proposed to connect at TDSP Station Code: WHPOD_x000D_ PTI BUS #: 1397_x000D_ Load/Load TR: LDWHPOD_x000D_ Voltage Level (Transmission): 138kV.
Project facts
| Canonical name | Wildhorse POD Solar |
|---|---|
| Queue ID | 23INR0537 |
| Status | suspended |
| Source status | suspended |
| Market | ERCOT |
| Technology | Solar |
| Capacity | 10.0 MW |
| State | Texas |
| County | Howard |
| Point of interconnection | TDSP Station Code: WHPOD_x000D_ PTI BUS #: 1397_x000D_ Load/Load TR: LDWHPOD_x000D_ Voltage Level (Transmission): 138kV |
| Requested (queue) date | 2023-10-02 |
| Proposed in-service date | 2026-02-28 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Highpeak Solar, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata