Winkler Solar (18INR0022)

Winkler Solar is a 150.0 MW solar interconnection project in Winkler, Texas with a current status of withdrawn. It is proposed to connect at tap 138kV 1009 Yucca - 1146 Notrees.

150.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameWinkler Solar
Queue ID18INR0022
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity150.0 MW
StateTexas
CountyWinkler
Point of interconnectiontap 138kV 1009 Yucca - 1146 Notrees
Requested (queue) date2016-02-02
Proposed in-service date2019-12-31
Operational date
Withdrawn date2018-12-07
DeveloperRES Americas
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.