Wolfforth 115kV substation #526524 (ASGI-2016-001)

Wolfforth 115kV substation #526524 is a 2.5 MW wind interconnection project in Lubbock County, Texas with a current status of withdrawn. It is proposed to connect at Wolfforth 115kV substation #526524.

2.5 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameWolfforth 115kV substation #526524
Queue IDASGI-2016-001
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity2.5 MW
StateTexas
CountyLubbock County
Point of interconnectionWolfforth 115kV substation #526524
Requested (queue) date2016-04-04
Proposed in-service date
Operational date
Withdrawn date2020-10-22
Developer
Utility / transmission ownerSPEC

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata