Wood Fern Wind (28INR0274)
Wood Fern Wind is a 197.3 MW wind interconnection project in Van Zandt, Texas with a current status of active. It is proposed to connect at Tap 345kV #2432 Tri-Corner to #3102 Tyler Grande.
197.3 MWCapacity
ActiveStatus
ERCOTMarket
WindTechnology
Project facts
| Canonical name | Wood Fern Wind |
|---|---|
| Queue ID | 28INR0274 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Wind |
| Capacity | 197.3 MW |
| State | Texas |
| County | Van Zandt |
| Point of interconnection | Tap 345kV #2432 Tri-Corner to #3102 Tyler Grande |
| Requested (queue) date | 2025-01-31 |
| Proposed in-service date | 2029-06-07 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Wood Fern Wind LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata