YERMO SOLAR (920)

YERMO SOLAR is a 75.0 MW solar interconnection project in Kern, California with a current status of withdrawn. It is proposed to connect at Coolwater-DunnSiding-Baker Substation 115kV.

75.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameYERMO SOLAR
Queue ID920
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity75.0 MW
StateCalifornia
CountyKern
Point of interconnectionCoolwater-DunnSiding-Baker Substation 115kV
Requested (queue) date2012-04-02
Proposed in-service date
Operational date
Withdrawn date2012-06-20
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata