City Utilities of Springfield - (MO) — Interconnection Queue Projects
City Utilities of Springfield - (MO) is associated with 25 tracked interconnection projects representing 1,670 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 8 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 12 | 776 MW |
| Gas | 11 | 713 MW |
| Wind | 1 | 150 MW |
| Battery | 1 | 31 MW |
Portfolio by market
| Market | Projects |
|---|---|
| MISO | 7 |
Geographic footprint
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| John Twitty Energy Center | 6195_ST2 | Other | 300.0 MW | operational | Greene, Missouri |
| Dallman | 963_4 | Other | 230.1 MW | operational | Sangamon, Illinois |
| John Twitty Energy Center | 6195_ST1 | Other | 194.0 MW | operational | Greene, Missouri |
| Westchester 138kV Substation | J750 | Wind | 150.0 MW | withdrawn | Morgan County, Illinois |
| Interstate | 7425_1 | Gas | 138.6 MW | operational | Sangamon, Illinois |
| James River Power Station | 2161_GT2 | Gas | 101.5 MW | operational | Greene, Missouri |
| James River Power Station | 2161_GT1 | Gas | 96.0 MW | operational | Greene, Missouri |
| McCartney | 7903_MSG2 | Gas | 58.9 MW | operational | Greene, Missouri |
| McCartney | 7903_MGS1 | Gas | 58.9 MW | operational | Greene, Missouri |
| John Twitty Energy Center | 6195_GT1 | Gas | 57.0 MW | operational | Greene, Missouri |
| John Twitty Energy Center | 6195_GT2 | Gas | 52.0 MW | operational | Greene, Missouri |
| McCartney | 7903_MGS3 | Gas | 48.9 MW | active | Greene, Missouri |
| McCartney | 7903_MGS5 | Gas | 48.9 MW | active | Greene, Missouri |
| McCartney | 7903_MGS4 | Gas | 48.9 MW | active | Greene, Missouri |
| James River Power Station | 2161_BAT1 | Battery | 31.0 MW | active | Greene, Missouri |
| Factory | 8016_1 | Other | 26.6 MW | operational | Sangamon, Illinois |
| Reynolds | 965_1 | Other | 17.5 MW | operational | Sangamon, Illinois |
| Noble Hill Landfill | 56404_NHLC | Gas | 3.2 MW | operational | Greene, Missouri |
| Lakeside | 964_D2 | Other | 1.8 MW | operational | Sangamon, Illinois |
| Lakeside | 964_D1 | Other | 1.8 MW | operational | Sangamon, Illinois |
| Lakeside | 964_D3 | Other | 1.8 MW | operational | Sangamon, Illinois |
| Springfield (CO) | 8100_1 | Other | 1.2 MW | operational | Baca, Colorado |
| Springfield (CO) | 8100_IC5 | Other | 0.8 MW | operational | Baca, Colorado |
| Springfield (CO) | 8100_IC4 | Other | 0.5 MW | operational | Baca, Colorado |
| Springfield (CO) | 8100_2 | Other | 0.2 MW | operational | Baca, Colorado |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through City Utilities of Springfield - (MO).
Start tracking with interXdata