MESQUITE BESS (25INR0697)
MESQUITE BESS is a 9.9 MW battery interconnection project in Cameron, Texas with a current status of active. It is proposed to connect at Substation: Mesquite, XFMR 1 Substation transmission kV: 138 ERCOT Station Long Name: MESQUITE ERCOT Station site code: MESQUITE ERCOT Bus#: 8554 ERCOT Load Name: Load1.
Project facts
| Canonical name | MESQUITE BESS |
|---|---|
| Queue ID | 25INR0697 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | Texas |
| County | Cameron |
| Point of interconnection | Substation: Mesquite, XFMR 1 Substation transmission kV: 138 ERCOT Station Long Name: MESQUITE ERCOT Station site code: MESQUITE ERCOT Bus#: 8554 ERCOT Load Name: Load1 |
| Requested (queue) date | — |
| Proposed in-service date | 2026-02-16 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Grenergy USA |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata