MESQUITE BESS (25INR0697)

MESQUITE BESS is a 9.9 MW battery interconnection project in Cameron, Texas with a current status of active. It is proposed to connect at Substation: Mesquite, XFMR 1 Substation transmission kV: 138 ERCOT Station Long Name: MESQUITE ERCOT Station site code: MESQUITE ERCOT Bus#: 8554 ERCOT Load Name: Load1.

9.9 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameMESQUITE BESS
Queue ID25INR0697
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity9.9 MW
StateTexas
CountyCameron
Point of interconnectionSubstation: Mesquite, XFMR 1 Substation transmission kV: 138 ERCOT Station Long Name: MESQUITE ERCOT Station site code: MESQUITE ERCOT Bus#: 8554 ERCOT Load Name: Load1
Requested (queue) date
Proposed in-service date2026-02-16
Operational date
Withdrawn date
DeveloperGrenergy USA
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata