RIO NOGALES AGP UPGRADE CT1 is a 19.0 MW gas interconnection project in Guadalupe, Texas with a current status of operational. It is proposed to connect at Existing gen 345kV Rio Nogales Power Project (# 5362).

19.0 MWCapacity
OperationalStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameRIO NOGALES AGP UPGRADE CT1
Queue ID19INR0205
Statusoperational
Source statusoperational
MarketERCOT
TechnologyGas
Capacity19.0 MW
StateTexas
CountyGuadalupe
Point of interconnectionExisting gen 345kV Rio Nogales Power Project (# 5362)
Requested (queue) date2019-02-27
Proposed in-service date2019-11-01
Operational date2019-11-20
Withdrawn date
DeveloperCPS Energy
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata