Jim Hogg County, Texas — Interconnection Projects

The interXdata warehouse tracks 11 interconnection projects in Jim Hogg, Texas, representing 3,311 MW of requested capacity.

11Total projects
1Active
9Operational
1Withdrawn
3,311 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other51,746 MW
Solar41,187 MW
Wind2378 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Las Mujeres Solar29INR0154Solar684.3 MWactiveJim Hogg, Texas
Mirando Valley Wind28INR0072Other478.7 MWoperationalJim Hogg, Texas
Viento Bravo Wind28INR0434Other366.5 MWoperationalJim Hogg, Texas
Ciervo Wind28INR0242Other301.5 MWoperationalJim Hogg, Texas
Barranca Wind 128INR0375Other300.9 MWoperationalJim Hogg, Texas
Zapata I W16INR0105Wind300.0 MWwithdrawnJim Hogg, Texas
Barranca Wind 228INR0376Other298.6 MWoperationalJim Hogg, Texas
Bell Song Solar30INR0041Solar167.6 MWoperationalJim Hogg, Texas
Bell Song Solar 331INR0009Solar167.6 MWoperationalJim Hogg, Texas
Bell Song Solar 230INR0049Solar167.6 MWoperationalJim Hogg, Texas
Sendero59654_1Wind78.0 MWoperationalJim Hogg, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Jim Hogg County.

Start tracking with interXdata