EPE — Interconnection Queue Projects
EPE is associated with 41 tracked interconnection projects representing 8,176 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
41Projects
8Active
2Operational
30Withdrawn
8,176 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 4 | 2,150 MW |
| Wind | 8 | 2,048 MW |
| Solar+Battery | 13 | 1,926 MW |
| Solar | 15 | 1,802 MW |
| Battery | 1 | 250 MW |
Geographic footprint
| State | Projects |
|---|---|
| New Mexico | 30 |
| Texas | 11 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Pi1000G | Q25-LG-6-10-0 | Gas | 1,033.6 MW | withdrawn | El Paso, Texas |
| EM500W Project | LG-20-4-1 | Wind | 500.0 MW | withdrawn | Chaves, New Mexico |
| LA450S | LG-16-9-1 | Solar | 450.0 MW | withdrawn | Luna, New Mexico |
| Montana Units 1-4 (Gas) | 39 | Gas | 420.0 MW | operational | El Paso, Texas |
| EPE Gen - Megellan | 35 | Gas | 348.0 MW | withdrawn | El Paso, Texas |
| EPE Gen - Caliente | 36 | Gas | 348.0 MW | withdrawn | El Paso, Texas |
| WCoMlu3m0b0uWs Solar Energy | 31 | Wind | 300.0 MW | withdrawn | Valencia, New Mexico |
| HI300SB Project | LG-20-3-31 | Solar+Battery | 300.0 MW | withdrawn | Grant, New Mexico |
| Same as project below | 30 | Wind | 300.0 MW | withdrawn | Socorro, New Mexico |
| HL250W | LG 22-3-5 | Wind | 250.0 MW | withdrawn | Grant, New Mexico |
| Ca-CO-250B | Q25-LG-6-5 | Battery | 250.0 MW | active | El Paso, Texas |
| EC250W Project | LG-18-3-1 | Wind | 250.0 MW | withdrawn | Eddy, New Mexico |
| EC500W Project | LG-17-7-1 | Wind | 247.0 MW | active | Chaves, New Mexico |
| Hi225SB Project | LG-21-9-1 | Solar+Battery | 225.0 MW | withdrawn | Grant, New Mexico |
| CA200S PV Project | LG-15-12-1 | Solar | 200.0 MW | withdrawn | Otero, New Mexico |
| AL200S Project | LG-21-9-2 | Solar | 200.0 MW | withdrawn | Luna, New Mexico |
| AE199SB | Q25-LG-6-11-0 | Solar+Battery | 199.0 MW | withdrawn | Chaves, New Mexico |
| Wi-Al3-199SB | Q25-LG-6-13-2 | Solar+Battery | 199.0 MW | active | El Paso, Texas |
| Me195SB | Q25-LG-6-6 | Solar+Battery | 195.0 MW | active | Luna, New Mexico |
| (SolarReserve) | 32 | Solar | 173.0 MW | withdrawn | Luna, New Mexico |
| N200S PV Project | LG-17-3-1 | Solar | 170.0 MW | withdrawn | El Paso, Texas |
| Solar Reserve | 33 | Solar | 169.0 MW | withdrawn | Luna, New Mexico |
| D150S Project | LG-17-9-1 | Solar+Battery | 150.0 MW | suspended | Dona Ana, New Mexico |
| LA130S Project | LG-19-3-2 | Solar+Battery | 130.0 MW | active | Luna, New Mexico |
| AC120SB Project | LG-17-9-3 | Solar+Battery | 120.0 MW | active | Otero, New Mexico |
| Granite Mountain Wind Power (Duke Energy Generation Services) | 34 | Wind | 101.2 MW | withdrawn | Hudspeth, Texas |
| HO100SB Project | LG-19-9-30 | Solar+Battery | 100.0 MW | withdrawn | Otero, New Mexico |
| SS100S | LG-22-9-5 | Solar | 100.0 MW | active | El Paso, Texas |
| EA100W Project | LG19-3-6 | Wind | 100.0 MW | withdrawn | Chaves, New Mexico |
| DS90S | LG-14-10-1 | Solar | 90.0 MW | withdrawn | Dona Ana, New Mexico |
| VS90SB | Q25-LG-5-29 | Solar+Battery | 90.0 MW | withdrawn | Dona Ana, New Mexico |
| Ho75SB | Q25-LG-6-10-1 | Solar+Battery | 75.0 MW | withdrawn | Otero, New Mexico |
| HJ73SB Project | LG-21-9-4 | Solar+Battery | 73.0 MW | withdrawn | Dona Ana, New Mexico |
| ST70S Project | LG-17-9-5 | Solar+Battery | 70.0 MW | withdrawn | Dona Ana, New Mexico |
| CO70S Project | LG-17-9-4 | Solar | 70.0 MW | withdrawn | Otero, New Mexico |
| SS50S | LG-22-9-4 | Solar | 50.0 MW | active | El Paso, Texas |
| Macho Springs Solar PV | 37 | Solar | 50.0 MW | operational | Luna, New Mexico |
| Fort Bliss | SG-15-6-1 | Solar | 20.0 MW | withdrawn | El Paso, Texas |
| NM Tularosa Solar Project (Lincoln Renewable Energy LLC) | 38 | Solar | 20.0 MW | withdrawn | Otero, New Mexico |
| V20S | SG-17-2-1 | Solar | 20.0 MW | withdrawn | Dona Ana, New Mexico |
| AN20S Project | SG-19-3-1 | Solar | 20.0 MW | withdrawn | Dona Ana, New Mexico |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through EPE.
Start tracking with interXdata